Regular rainfall benefits crops in Brazil.
Conab bulletin indicates improved moisture levels and recovery in producing areas.
C.Vale will inaugurate a new grain receiving unit in Goioerê, Paraná, on May 27th. The facility was built on its own 11,6-hectare site and expands its capacity to serve producers in the municipality and the surrounding region.
The cooperative invested R$ 88 million. The facility has a storage capacity of 721 sacks, distributed between a warehouse with a capacity of 700 sacks and two buffer silos totaling 21 sacks.
The receiving system will feature two hydraulic tippers for unloading trucks. Grain drying will be done using equipment with a capacity of 200 tons per hour, fueled by wood chips.
The complex also includes a 30-meter automated weighbridge, a sorting system with a mobile collector installed in a 25 by 11 meter building, a 2,000 square meter warehouse for storing supplies, and a 500 square meter administrative office.
The new unit is located on the banks of the PR-472 highway, which connects the municipalities of Goioerê and Rancho Alegre do Oeste.
Receive the latest agriculture news by email